Work Detail
Peel District School Board – Mineola Public School
Provided full design and project management services for the replacement of the windows system throughout the school. In total 110 sections of windows were replaced throughout the school with curtain wall system. The frames were of aluminum construction with thermal breaks, the double pane glazing consisted of heat strengthened glass units between a warmed edge spacer and dry gaskets were utilized on the interior and exterior to seal the glazing units within the frames. The upper curtain wall sections were installed with spandrel panels to provide the appearance of glass, but limit the visibility into the school.
-
Building Science
-
Peel District School Board – Mineola Public School
-
145 Windy Oaks, Mississauga, Ontario